Comparing UPM with Cold Mix Manufacturing’s Greenpatch

Demonstrating UPM® in Mixed Volume traffic and Mixed Loads.
Install Conditions: Dry Above 40ºF
Pavement Conditions: Severe cracking
Installation Date: May 2, 2011
Time Elapsed: 2 Years
Location: South Boston, MA, L Street

UPM used in direct comparison with Cold Mix Manufacturing’s Greenpatch. UPM repair is solid after 2 years.

Comparing Pavement Unique Paving Materials

6 Months after UNIQUE repair products

2 years after use of UNIQUE repair materials

Learn more about our asphalt & concrete repair products

If you’re looking for the best in asphalt repair companies that can supply premium materials, UNIQUE Paving Materials is the optimal choice for you. The road repair services and materials we offer are proven to save time, money, and even repeated repairs.