Demonstrating UPM® in Mixed Volume traffic and Mixed Load.
Install Conditions: Dry Above 40ºF,
Pavement Conditions: Severe cracking and deep wheel track depression
Installation Date: November 8, 2011
Time Elapsed: 5 Months
Location: Bangor, ME, Ohio Street
UPM used as a roadway shim. Pothole repaired and then expanded repair site to test UPM to act as shim. Needed to raise elevation of pavement in worn wheel track.
INSTALL
24 Days Later
70 Days Later
5 Months Later