Shallow Pavement Repair Case Study

UPM®, Permanent Pavement Repair Material
Demonstrating UPM® for NH DOT District 2
Install Conditions: Dry Above 40ºF
Pavement Conditions: Shallow Repair
Installation Date: June 14, 2010
Time Elapsed: 19 Months
Location: Rumney, NH, Route 25 (Eastbound Lane)

UPM® is produced with ¼” Aggregate making it ideally suited for scabs or areas where the top coarse has delaminated.

BEFORE

pavement issue

84 DAYS LATER

repairing pavement

1 YEAR LATER

post pavement repair

19 MONTHS LATER

repair pavement material

Learn more about our asphalt & concrete repair products

If you’re looking for the best in asphalt repair companies that can supply premium materials, UNIQUE Paving Materials is the optimal choice for you. The road repair services and materials we offer are proven to save time, money, and even repeated repairs.