Demonstrating UPM® in Low Volume traffic and Light Loads.
Install Conditions: Dry Above 40ºF
Pavement Conditions: Poor Base Conditions caused failure
Installation Date: December 29, 2011
Time Elapsed: 2 ½ Months
Location: Topeka, KS, 4237 Colly Creek Dr.
10’X15’X8” Concrete failure, brought in gravel to help stabilize base