UPM Permanent Pavement Repair Material

Demonstrating UPM® in Low Volume traffic and Light Loads.

Install Conditions: Dry Above 40ºF

Pavement Conditions: Poor Base Conditions caused failure

Installation Date: December 29, 2011

Time Elapsed: 2 ½ Months

Location: Topeka, KS, 4237 Colly Creek Dr.

10’X15’X8” Concrete failure, brought in gravel to help stabilize base

Unique Paving Materials final lift concrete
Dusted, prior to final lift
UNIQUE Pavement material
Feburary 7th, 2012

Learn more about our asphalt & concrete repair products

If you’re looking for the best in asphalt repair companies that can supply premium materials, UNIQUE Paving Materials is the optimal choice for you. The road repair services and materials we offer are proven to save time, money, and even repeated repairs.